From drawings to handover in four stages

Specification & Sampling
I

Specification & Sampling

We start with your drawings, room schedule and brand standards, then propose fabrics, finishes and construction details for each item.

Drawing and BOQ reviewSample boards per room typePriced proposal with lead times
Typical duration: 1–3 weeks
Mock-up Room
II

Mock-up Room

For larger projects we fit one complete room first. You sign off the finished result before production starts.

Full-scale pilot roomSnag list and revisionsFinal specification freeze
Typical duration: 2–4 weeks
Production at Scale
III

Production at Scale

Cutting, sewing, upholstery and joinery in our Lahore workshop, scheduled backwards from your handover date.

Weekly progress reportsBatch-tested fire-rated clothQuality checks per piece
Typical duration: 4–10 weeks
Installation & Aftercare
IV

Installation & Aftercare

Our own crews fit everything, floor by floor. After handover we keep spares and respond to service calls.

Phased, out-of-hours fittingHandover pack and care guidesSpares and repair service
Typical duration: Phased to site

Common questions

There is no fixed minimum. Most contract projects start at around 20 rooms or 100 pieces, but we also take single boardrooms and receptions.